Request a quoteBuy GPUs
HYPERCUBE
HYPERQ
GPUs
Astra Cybercity
Sectors
Press Room
Company

info@worldoneindia.netWhatsApp +91 93244 08321

Sovereign AI, built in modules.

World One brings HYPERCUBE modular AI data centres to India, starting with Astra Cybercity on Maharashtra's Konkan coast.

HYPERCUBE SuperPod Ultra compute module in pearl white with a graphite core and an emerald light line. Styling concept. Styling concept. Configuration not finalised.
USD 3 billionplanned for Astra Cybercity under the MoU with the Government of Maharashtra
14 current + 1 next generationFourteen current range entries, plus the SuperPod Ultra reference architecture
16 to 20 weeksto bring a Factory 9 block into service once procurement, compliance and site gates release
India partnerof Quantum AI Connect, the Abu Dhabi owner of HYPERCUBE and HYPERQ
Astra Cybercity

A USD 3 billion commitment to sovereign AI on Indian soil.

A phased AI data centre and technology campus in Ratnagiri, Maharashtra, with the potential to create up to 10,000 jobs.

The coastline at the Astra Cybercity site. Site photograph from the Astra Cybercity brochure.
Siddhartha Srivastava (centre) exchanges the MoU with Chief Minister Devendra Fadnavis (right) as Industries Minister Uday Samant (left) looks on. Invest Maharashtra, Mumbai, 1 October 2026.

Signed with the Government of Maharashtra.

On 1 October 2026, World One exchanged a Memorandum of Understanding for Astra Cybercity at the launch of Invest Maharashtra in Mumbai. The first phase deploys HYPERCUBE, so the first sovereign AI capacity can come into service within the project's first year, while the wider campus takes shape.

One family, from a laptop to a campus.

Fourteen current range entries cover personal AI through campus infrastructure. SuperPod Ultra adds one next-generation reference architecture, with design targets subject to engineering qualification and acceptance testing.

Illustrative product renderings. Product specifications are stated separately.

See every system

Modules are integrated and tested in the factory, then shipped ready for power, cooling and network.

Months, not years.

A conventional data centre of comparable capacity typically takes two to three years to build. HYPERCUBE units can be installed and brought into service in as little as six months.

  1. Built and tested in the factory. Each module is integrated and accepted before it ships, and arrives ready to connect.
  2. Capacity in steps. Add modules as demand grows, instead of committing to a whole building on day one.
  3. Data stays in the country. Sovereign configurations keep compute, storage and keys under national control.
  4. Ready for the next generation. Designed around NVIDIA GB300 today and Vera Rubin as it arrives.

World One works in partnership with Quantum AI Connect, the Abu Dhabi company that owns and develops HYPERCUBE and HYPERQ.

Read the announcement

Illustrative consultation room with a complete table, chairs and architectural scale model.
Illustrative consultation setting.

Start with the right conversation.

Tell us about the workload, the site or the programme. We will reply with the right next step, whether that is a configuration, a site review or a meeting with the team.